Permanent Magnet Crane 20160307
Telescopic permanent magnet crane is more convenient for steel hoisting
An extensible beam is suitable for the workplaces which changes frequently and with big change in the specifications of the work pieces. For lifting of steel plate length shorten half, which do not need to use the original number of permanent lifting magnets , can be done by shorten telescopic beam.
Telescopic lifting can lift and move cargo beyond of the original working area in the operation of signal beam. Especially when there are obstructions (such as column, etc.) can increase the auxiliary working area, making special object or equipment can make full use of its service space.
If customer needs to lift the work piece out of the scope of hanging, he can use the solution of telescopic crane. Adjustable beam supported by girder can be hanging out of 2 m distance of the track to one side or both sides, can service to new lifting outside area and difficult to close to area. Customers can according to their actual use choose required overhanging and telescopic size.
The characteristics of electric permanent magnets Neodymium Magnets used for telescopic crane:
Electric control PM lifting doesn't need electricity in work, attracting work pieces by permanent magnet, avoiding the danger of the objects fell off due to the magnetism loss of the lifting electric PM in sudden power lost or connecting cable damage.
Electric permanent magnet can produce powerful suction to 16 kg/cm squared, no attenuation with the extension of time, with great security. While the electromagnet has limited magnetism holding time after a power outage, a long time power cut is easy to cause accident. Electric PM spreader can be equipped with a ground detection function, the demagnetization operation is effective only when the lifting landed completely, avoiding the risk of wrong operation.
Electric control permanent magnet jack use electricity within 0.1 ~ 2 seconds of magnetization and demagnetization, the electromagnet save power consumption by more than 95%. The control system is simple, and electric PM body and control system are light weight, can reduce lifting equipment load, increase the lifting weight, improve equipment utilization. Battery is required for the electromagnet maintains magnetism in power cut, so the electric permanent magnet is more environmentally friendly.
An extensible beam is suitable for the workplaces which changes frequently and with big change in the specifications of the work pieces. For lifting of steel plate length shorten half, which do not need to use the original number of permanent lifting magnets , can be done by shorten telescopic beam.
Telescopic lifting can lift and move cargo beyond of the original working area in the operation of signal beam. Especially when there are obstructions (such as column, etc.) can increase the auxiliary working area, making special object or equipment can make full use of its service space.
If customer needs to lift the work piece out of the scope of hanging, he can use the solution of telescopic crane. Adjustable beam supported by girder can be hanging out of 2 m distance of the track to one side or both sides, can service to new lifting outside area and difficult to close to area. Customers can according to their actual use choose required overhanging and telescopic size.
The characteristics of electric permanent magnets Neodymium Magnets used for telescopic crane:
Electric control PM lifting doesn't need electricity in work, attracting work pieces by permanent magnet, avoiding the danger of the objects fell off due to the magnetism loss of the lifting electric PM in sudden power lost or connecting cable damage.
Electric permanent magnet can produce powerful suction to 16 kg/cm squared, no attenuation with the extension of time, with great security. While the electromagnet has limited magnetism holding time after a power outage, a long time power cut is easy to cause accident. Electric PM spreader can be equipped with a ground detection function, the demagnetization operation is effective only when the lifting landed completely, avoiding the risk of wrong operation.
Electric control permanent magnet jack use electricity within 0.1 ~ 2 seconds of magnetization and demagnetization, the electromagnet save power consumption by more than 95%. The control system is simple, and electric PM body and control system are light weight, can reduce lifting equipment load, increase the lifting weight, improve equipment utilization. Battery is required for the electromagnet maintains magnetism in power cut, so the electric permanent magnet is more environmentally friendly.